STUDI JUST IN TIME UNTUK MENINGKATKAN KINERJA PRODUKTIVITAS PERUSAHAAN
DOI:
https://doi.org/10.31942/akses.v4i8.518Abstract
The research was held by literature study of the last risets about Just In Time system for company productivity performance. On this riset, was developed a model with four hypothesis, based on four major construct : supplier, velocity of production process, production system, productivity performance. The result were giving many causality as stated as on the hypothesis.Key words : Supplier, velocity of production process, production system, productivity performance
Downloads
Published
2009-10-15
Issue
Section
Articles